This article describes how to reimport a survey into an existing activity. For unpublished activities, you can edit the survey directly. If the activity is published and scheduled to deploy, unpublish it first, then reimport the survey as new. Follow the steps: access the Activity List, change the activity status to Draft by unpublishing, confirm the action, and then reimport the survey. Ensure the changes are successful by testing them.
If you make changes to a published and scheduled-for-deployment survey, you will need to unpublish the Activity in the Fuel Cycle Platform, then reimport the survey and add it again as a new survey to your existing Activity. Even if the Activity is still in draft mode and you have not published it, this is the correct way to proceed.
- Click on your Activity List.
- Change the Activity status to Draft by selecting Unpublish.
- Click the Actions menu to the right of the Activity you want to edit.
- Click Unpublish Activity.
- Confirm that you want to unpublish this Activity.
- Click the Setup breadcrumb at the top.
- Under Link an Existing Survey at the top of the page, select the survey you want to apply to this Activity.
- Publish the Activity.
- Test the survey to ensure that the expected changes were applied successfully.